Showing posts with label leapfrog. Show all posts
Showing posts with label leapfrog. Show all posts

Wednesday, April 18, 2018

Active mobile accounts
Cubans now have 5 million mobile accounts. The five-millionth account was recently opened Guanabacoa, in the eastern part of Havana and we see here that growth slowed last year, but has resumed -- perhaps due to increased 3G availability.

Most Cubans have 2G phones, which are used primarily for making calls and sending text messages that may have attached images. As of June 2017 there were 856 2G base stations, covering 75% of Cuban territory and 85% of the population.

Cuba is rolling out 3G connectivity and ETECSA reports that 47% of the population is now covered and, as of last June, there was some coverage in all provincial capitals and tourist resorts.

The only speed data I have seen was gathered by Armando Camacho who ran a number of 3G speed tests in Havana (near the corner of Patrocinio and 10 de Octubre) and observed ping time to a server in Miami as ranging from 91 to 127 milliseconds, upload speed from .48 to 1.58 Mbps and download speed from .85 to 10.42 Mbps. The latter is fast enough to allow Web browsing and other applications, particularly those like YouTube Go, that are designed for use over slow, expensive connections in conjunction with offline SD-card storage.

Armando observed considerable speed variance, suggesting that others were sharing the same radio or backhaul resources and performance would be frustrating at times. (Have others run similar tests)?

I don't have any statistics, but many Cuban phones are incompatible with ETECSA's 3G service, so users will be stuck with 2G until they get new 3G phones.

Upgrading to 3G technology when 4G is common in many nations and 5G is close on the horizon may sound discouraging, but it makes sense as a stopgap strategy for Cuba since it keeps backhaul load down and phones are cheap. That being said, I hope they are evaluating the possibility of leapfrogging to 5G technology when it matures and they can afford it.

=====
Update 4/21/2018

For the 26-year history of mobile phones in Cuba see this post.

Monday, April 2, 2018

In a previous post, I suggested that Cuba might be able to leap over 4G to 5G wireless infrastructure using satellite and terrestrial networks for backhaul. While that would require political and policy change, it would be a good fit with Cuban culture and skills.

Before talking about Cuba, let me say a bit about wireless generations.

Each mobile technology generation used new technology and enabled new applications:
  • 1G: Voice calls
  • 2G: Digital data for text and sending small images
  • 3G: Smartphones for low-quality video, Web browsing, and GPS
  • 4G: High speed, lower latency communication for video streaming and chat and interaction with complex Web content
Fifth-generation wireless will be faster than today's 4G and latency is expected be on the order of 1 ms within the 5G network. Radios will be capable of beamforming -- rapidly switching focused beams among large numbers of devices -- and simultaneous two-way (full duplex) transmission at a given frequency. This will enable real-time applications like control of autonomous vehicles, remote medical procedures and augmented and virtual reality as well as fast file transfer and streaming and other, un-imagined applications.

Do not think of this as the evolution of the cell-phone network; think of it as a discontinuity in wireless communication to mobile and fixed users.

In addition to enabling new applications, each mobile computing generation uses different frequency bands and 5G is being designed to use very high frequencies. High-frequency radio waves enable high-speed transmission and small antennas. Being able to fit multiple small, cooperating antennas in a phone or other device (multiple inputs and outputs (MIMO) increases transmission range and speed. However, there is a high-frequency tradeoff -- low-frequency waves travel farther and are better able to penetrate obstacles like buildings and trees than high-frequency waves.

Small cell on the terrace
of a building in Bangalore
High-frequency networks will require a multi-tier architecture. With the current cellular network, phones and other devices communicate with a relatively distant base station that is connected by fiber or high-speed wireless to the Internet. Fifth-generation wireless will require many "small cell" radios that communicate with those high-capacity base stations.

Now back to Cuba (and other developing nations).

As of last year, there were 879 cellular base stations in Cuba, 358 of which had been upgraded to support 3G communication. As of 2016, 85.3% of the population was covered by 2G cellular and 47% of the population had 3G coverage. (Note that 2G coverage has barely increased since 2010 and it has been flat since 2012). If they continue rolling out 3G, it should reach the 85.3% fairly soon, but new base stations will have to be added to cover the entire population.

Upgrading from 2G to 3G requires new equipment and also more backhaul capacity between a base station and the Internet because 3G transmission speeds are greater than 2G and 3G applications use more data. For most Cubans, it would also require the purchase of a new phone. High-speed, 5G service would require much more backhaul capacity and new phones.

In densely populated areas it will be economically feasible to provide that backhaul using fiber, but fiber to support 5G capacity throughout the island would be very expensive. In many locations, satellite connectivity may turn out to be a better backhaul medium than fiber. SES Networks (O3b) will be offering connectivity using their middle-Earth orbit satellites before Cuba is ready for 5G and by the time they are ready, low-Earth orbit satellite connectivity from vendors like OneWeb and SpaceX Starlink will be available.

But what about the large number of small-cell radios that be feeding 5G base stations?

Like today's WiFi radios, they will be installed and maintained by community members and users. Cubans are known for do-it-yourslef innovation, for example in keeping old cars running and installing motors on bicycles and they have built community networks in places like Gaspar, Camagüey and Pinar del Río. Havana's SNET, is said to be the largest community network in the world that is not connected to the global Internet and there are over 8.000 amateur radio operators and over 1,400 active, self-employed programmers in Cuba.

Small cell radios will be semi-automatically configured and simpler to install and maintain than the WiFi radios used in today's street nets, but that is the easy part. Decentralized technology calls for decentralized decision making. Local people who are locally elected should decide questions like how many small cells to deploy in a neighborhood or rural area, where they should be located and how to pay for them. Would the current municipal electoral districts (from 200-3,000 inhabitants) be an appropriate locus of network control?

ETECSA would cede local control but be responsible for acquiring international bandwidth and providing backhaul over fiber or satellite from their base stations. They would also serve as consultants to local communities and could negotiate high-volume discount purchases of locally-owned equipment.

Note that I am still assuming a major role for ETECSA in spite of the fact that historically, nations like Cuba have privatized telecommunication and licensed foreign operators in exchange for investment in infrastructure. In previous posts I have suggested that vested interest and bureaucracy at ETECSA and uncertainty over control may be stifling Cuban Internet expansion. To the extent that that is the case, the new administration would have to change the organizational culture to focus on Cuba's stated economic and social policy goals -- leapfrogging current regulation and policy along with the technology. That may be wishful thinking, but if they are able to do so, they will have an advantage over nations in which private company profit trumps (no pun intended) social goals.

The technology is also ill-defined and unproven. While the standard for the first version of the 5G radio interface between a device and base station is complete, other hardware and software standards are still being developed and 5G is based on technologies that have been tested in trials, but not in large scale practice. The first deployments are not expected until next year, user and network equipment prices are not set and competing technologies like Starry may impact pricing and deployment.

Novel, unproven 5G wireless technologies (source)

In spite of this policy and technology uncertainty, ETECSA can start the ball rolling today by cooperating with and providing Internet gateways to SNET and other street nets, possibly in conjunction with support of the Internet Society and the Organization of American States. They can also learn from the experience of others like Gufinet in Spain and a variety of community networks in the US and elsewhere. At the same time, they should be following the 5G standards process directly and through their vendors, primarily Huawei and SES Networks (O3b), in order to plan for the future.

Thursday, December 14, 2017

Last January, Doug Madory of Dyn Research reported on Cuban traffic, noting that C&W's share had increased:


Yesterday Madory reported that ETECSA had activated a new internet transit provider, medium-Earth orbit (MEO) satellite-connectivity provider O3b Networks (Other 3 billion), replacing geostationary satellite provider Intelsat:


(They have also added Telecom Italia, which, until 2011, owned 11% of ETECSA, but I will save that for another post).

O3b's MEO satellites orbit at an altitude of around 8,012 km above the equator while Intelsat's geosynchronous satellites are at around 35,786 km, therefore the time for a data packet to travel from earth to an O3b satellite and back to Earth is significantly less than to an Intelsat satellite. This move to O3b may be related to ETECSA's recent decision to offer SMS messaging service to the US (at an exorbitant price) and it will surely improve the speed of interactive applications.

That is today's situation as I understand it, but now I want to speculate on the future of Cuban satellite connectivity -- say in the early 2020s.

First a little background on O3b Networks. O3b is a wholly owned subsidiary of SES but it was founded in 2007 by Greg Wyler, who has since moved on to a new venture called OneWeb. While O3b provides service to companies like ETECSA, OneWeb plans to also provide fast global connectivity to individuals in fixed locations like homes and schools as well as the "Internet of things."

This animation was prepared by Teledesic,
formed in 1990 to provide LEO satellite
connectivity. Teledesic failed, but
technology, the market and executive skill
have changed since that time.
OneWeb plans to connect the "other 3 billion" people using a constellation of around 1,600 satellites in low-Earth orbit (LEO) at an altitude of 1,200 km and another 1,300 in MEO at 8,500 km. They are working with many vendors and partners and plan to launch their first satellites in March 2018. They will begin offering service in Alaska in 2019 and hope to cover all of Alaska by the end of 2020. By 2025 they expect to have 1 billion subscribers and their mission is to eliminate the global digital divide by 2027.

Now, back to Cuba. ETECSA is doing business with Wyler's previous company O3b. Might they also be talking with his current company, OneWeb? It takes time to launch hundreds of satellites, so service is being phased in -- might Cuba come online sometime after Alaska? By connecting Cuba, OneWeb would gain publicity, the goodwill of many nations and access to a relatively well-educated, Internet-starved market and it would enable Cuba to quickly deploy broadband technology.

As I said, this is pure speculation. OneWeb faces significant technical, business and political challenges and may fail. Politics would be particularly challenging in the case of Cuba. Both the US and Cuba would have to make policy changes, but maybe the time is right for that -- the Cuban government will change in 2018 and the US government is likely to change in 2020 when Alaska comes online.

OneWeb has established an indirect relationship with ETECSA through O3b, but other companies, including SpaceX and Boeing, are working on similar LEO projects. Might ETECSA be talking to the others?

SpaceX is particularly interesting. Theirs is the most ambitious plan and their experience as a rocket company is invaluable. Less tangibly, founder, CEO and lead designer Elon Musk is known for audacious risk-taking. OneWeb will begin with Alaska -- might SpaceX begin with Cuba? In serving Cuba, they could also serve the Eastern US and since Cuba is an island the footprint of a satellite would not be so densely populated. SpaceX would gain publicity and international political good will.

To learn more, see this survey of LEO satellite plans and related issues.

====
Update 2/27/2018

SES subsidiary O3b has gone public with their agreement to route ETECSA traffic and Doug Madory has updated the route graph (above) that he provided when he first noticed the link last December.

The following graph shows that O3b now accounts for about 5% of ETECSA's routes and, as in December, geosynchronous satellite provider Intelsat is gone. Latency over the O3b link will be much lower than it had been with Intelsat, so some users will see improved performance.


A friend tells me that the O3b ground station is about 25 miles east of Havana in Jarusco -- the location of the original Soviet Carib 1 ground station in 1974.

Satellite ground station in Jarusco (source)







Friday, June 9, 2017

I hope ETECSA is planning for the future and views this 3G rollout as an interim stopgap.

ETECSA is rolling out 3G mobile service in Havana and elsewhere in Cuba and Telegeography reports that there are now 229 3G base stations in Cuba.

Where and how extensive is the coverage?

ETECSA says 3G coverage is available in all of Havana, provincial capitals and tourist resorts. AT&T says there is GSM/GPRS coverage for 85% of national territory.

Here is a crowdsourced 3G coverage map of Cuba as of February 17, 2017:


Strong signal: received signal strength indicator (RSSI) > -85dB, Weak: RSSI < -99dB

Again, this is a crowd-sourced map, so it represents a lower bound on coverage, but it paints an unsurprising picture of 3G deployment -- near a backbone and strongest in cities.

Who has access to the 3G network and what can they access?

Google Fi service was
available earlier this year.
Tourists and foreign business travelers have had expensive Internet access while roaming in Cuba for some time. For example, AT&T and T-Mobile charge $2 per megabyte. Recently Digicel recently announced much lower cost roaming on a "dedicated tourist-only 3G mobile network," which sounds like the network described by ETECSA above. They charge between 17 and 25 cents per megabyte, depending on the size of the prepaid order.

The best deal of all was fleetingly offered by Google on their Fi mobile service. Earlier this year, users reported that Google was treating roaming data the same as domestic data -- $10 per gigabyte. Unfortunately, that capability has been turned off, but it may be a hint of things to come.

But which Cubans -- other than Raúl Castro -- have 3G access? I have been told that some people have 3G access because of their work, but have no confirmation of that. I've also been told that some hackers have been able to get 3G access, but, again, have no confirmation.

Assuming that some Cubans have access to the 3G network, are they able to see the global Internet or are they restricted to services offered on the national network? (I bet Raúl has international access).

(source)
How about speed?

Armando Camacho ran a number of 3G speed tests in Havana (near the corner of Patrocinio and 10 de Octubre) and observed ping time to a server in Miami as ranging from 91 to 127 milliseconds, upload speed from .48 to 1.58 Mbps and download speed from .85 to 10.42 Mbps. He observed considerable speed variance, suggesting that others were sharing the same radio or backhaul resources.

What is the interim plan for 3G access?

Today the 3G network serves tourists, foreign business people, and perhaps some Cubans at work or in government. ETECSA may be planning to extend the service to subscribers as a much-needed supplement to their current public-access centers. I don't know what their plans are, but more 3G will require more fiber and microwave connectivity for backhaul. Only ETECSA knows what they are installing today.

They may also be planning to extend 3G mobile to rural areas. In April, the Ministry of Agriculture announced plans to bring Internet connectivity and other computer services to rural areas beginning in Granma, Ciego de Ávila and Isla de la Juventud. Will 3G be part of this promised rural coverage? Again, backhaul would have to be provided.

What is the long-run mobile plan?

Regardless of the short-run, 3G technology is only an interim step. Since Cuba has so little legacy infrastructure, they are in a position to leapfrog today's 4G technology and plan for 5G mobile connectivity. If that is the case, they should be investing in fiber for backhaul in places that microwave can serve today -- long, microwave "daisy chains" will not have the speed or capacity for a modern Internet in five or ten years. They should also be planning on fiber to the curb, building, and home in order to support the myriad devices expected to comprise the Internet of things as well as fixed connectivity.

Fifth generation standards are not yet set, but the migration of base-station function to the "cloud" will occur as the number of base stations and backhaul speed increase. That implies the need for datacenter planning and investment for the future. (See this Stragey& analysis for more on the 5G architecture).

As usual, I have more questions than answers, but I hope ETECSA is planning for the future and views this 3G rollout as an interim stopgap.

-----
6/12/2017

Tu Android, the Cuba Android community blog, has a post on determining whether your smartphone is compatible with Cuban 3G. The post begins with an overview of the requirements and lists compatible phones sold by ETECSA and the Blu phones that are compatible. Evidently, that was not enough, because there are currently 316 comments in which users are helping each other out.

The comments are reminiscent of the early PC hobby days in the US -- questions and answers are coming from uncertain users and expert hackers. As the Tu Android tagline reads -- "this is a family, not a blog." (I am naively hopeful that Cuban culture may produce a unique Internet from which we can all learn).

If you are a Cuban and not sure whether your phone can or can be altered to use the 3G network or are not sure why you cannot connect (evidently ETECSA is rolling out activations over time) check out the post and the comments -- ask the family.

-----
Update 6/22/2017

We now have a couple of answers to our 3G mobile questions. Hilda María Arias Pérez, Central Director of ETECSA’s Mobile Services Division, says there are 4,220,000 mobile accounts and 856 2G locations, covering 75% of Cuban territory and 85% of the population. They began the 3G rollout in April and now have 343 3G locations covering 13 % of the territory and 47% of the population. (For more on mobile coverage, see this post).

Engineer Arias Pérez discusses ETECSA's mobile coverage in this interview:


Friday, December 2, 2016

Might ETECSA, Cuba's government-monopoly telecommunication company, collaborate with Google to provide connectivity in Havana? This post offers conjecture, but it is informed conjecture.

Consider the following:
  • When Google Fiber started in Kansas City, most people assumed that it was a demonstration project, intended to spur investment by the incumbent US Internet service providers (ISPs). Few thought that Google wanted to become a retail ISP.
  • Google Fiber garnered a lot of publicity and Google, began speaking of it as a real, profit-making business. They announced other cities and started laying fiber in some of them.
  • Last June, Google bought Webpass, a small ISP that deploys fiber and was experimenting with unproven, but perhaps revolutionary pCell wireless technology from Artemis Networks. I speculated that they might be thinking of shifting Google Fiber to a hybrid fiber-wireless model based on that acquisition and other experiments they were conducting.
  • Last October Google Fiber announced that their work would continue in cities where they had launched or were under construction, but they would "pause operations and offices" in cities in which they had been conducting exploratory discussions and they took many, but not all workers off the Google Fiber project.
  • Google's Project Link has installed wholesale fiber backbones in two African capitals and I have suggested and speculated that they might do the same in Havana (with the caveat that they do it in conjunction with ETECSA, since there are no competing retail ISPs in Cuba as there are in Africa).
  • Google fiber backbones in Kampala and Accra
  • Last July ETECSA announced that they would be running a fiber trial in parts of Old Havana. They did not specify if it was fiber to the premises or neighborhood.
  • A month ago, a friend told me that a friend of his who worked at ETECSA said the fiber trial would begin December 5.
  • Last week, Trump threatened to "terminate the deal" (whatever that means to him) if Cuba would not make it better.
  • Yesterday, nearly identical stories suggesting that the White House was pushing Cuba on deals with Google and General Electric were published in the Wall Street Journal and El Nuevo Herald.

That is all for real -- now for the conjecture ...

Maybe the trial in Old Havana will be a joint project between Google and ETECSA. Google has considerable fiber installation experience with Project Link in Africa and Google Fiber in the US. A joint project with ETECSA would be relatively simple because they would not have to deal with competing ISPs as in Africa or lawsuits and other obstacles from incumbent ISPs as in the United States.

It could either be a pilot experiment -- a trial -- or the first step in leapfrogging Havana's connectivity infrastructure. One can imagine Google installing a fiber backbone in Havana like they have done in Accra and Kampala and leaving it up to ETECSA to connect premises using a mix of fiber, coaxial cable and wireless technology.

If that were to happen, Havana could "leapfrog" from one of the worst connected capital cities in the world to a model of next-generation technology. If things went well in Havana, which city would be next?

The partnership between Google and ETECSA could take many forms. Google might supply expertise and capital and ETECSA could supply labor and deal with the Cuban and Havana bureaucracies.

In return, Google would get terrific publicity, a seat at the table when other Cuban infrastructure like data centers or video production facilities were discussed and more users to click on their ads. (Take that Facebook). Havana could also serve as a model and reference-sell for cooperation between Google and other cities. (Take that Comcast and AT&T). There might even be some revenue sharing, with ETECSA paying Google as the ISPs do in Africa.

This would also be a win for the US administration and President Obama's legacy. Trump says he wants to renegotiate "the deal" with Cuba. If so, he would find Google (and GE?) at the negotiating table along with US airlines, telephone companies, hotel chains, cruise lines, etc.

Again -- this is conjecture ... but would the Wall Street Journal print something if it were not more than a rumor -- perhaps something leaked by the White House?

A Google-ETECSA collaboration in Old Havana?

-----
Update 12/7/2016

Well, it looks like my conjecture was off base. December 5th has come and gone without an announcement of the fiber trial in Havana with or without Google's participation.

The US-Cuba Bilateral Commission met today and their press release enumerated considerable progress in several areas, but said nothing about deals with Google or other companies.

An article in OnCuba says that agreements were reached with Google, General Electric, Goodyear, Caterpillar and Norwegian, Royal Caribbean and Pearl Seas Cruises. It restates that Cubans have access to the Play Store and mentions their collaborated on Kcho's WiFi hotspot, but it says nothing about more connectivity or collaboration with ETECSA.